High quality/High cost performance Factory Price Sj-50 Film Blowing Machine Single/Double Winder

Min.Order: 1
Product origin: Wenzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 7000 ~ 11000

Description
Product Description

 Film blowing machine with single rewinder and fixed die head
1.Rewinder with inverter
2.Chinese inverter,Chinese motor ,chinese temperature control .
3.stainless heater 

 

 
Product Parameters

Specification:

 ModelSJ-50/MB600SJ-55/MB800SJ-60/MB1000SJ-65/MB1200
 Screw Diameter (mm)Φ50Φ55Φ60Φ65
Screw Length (L/D)28:1
Gear box 133146146173
 Film Width(mm) 200-600300-800400-1000600-1200
 Film Thickness(mm) 0.006-0.10
 Max.Extrusion Output (kg/h)40506070
 Die Size(mm)Φ60/100Φ80/150Φ100/200Φ120/250
 Cylinder Cooling (Kw)0.250.25X10.25X20.25X2
 Driving Motor(kw) 111518.522
Total power(kw)28364248
 Cover Dimension(m) 5.0*2.1*3.85.0*2.3*45.5*3.3*4.25.8*3.6*4.5
Weight of Machine(kg)1800kg200023002600
Detailed Photos

Other product recommendation

Other machine 

workshop picture


Group picture with customer

 

Customer  Feedback
Packaging & Shipping

 


FAQ

 


FAQ
1.:Are you factory or trading company ?

we are factory specialized in plastic machine  for many years  ,all of our engineer with more than 20 years experience .

2. Where is your factory? How can i visit your company?
our factory is located in Ruian city,zhejiang province, China.

Its about 40 minutes from shanghai by plane(4 hours by train).we will pick you up on airport or station .welcome to visit our factory

3 How long is your delivery time?
 On normal our delivery time is 30-45 days .if you need it ugently ,we can make your machine first.about 10 days

4.:What's your warranty policy?
18 month guarantee and whole life maintance ,
 
5:What package do you use for the product?
Be Coated with anti-corrosion oil, and covered with plastic film,  wooden box package need extra cost .
 
6:Does your factory provide installation service?
Our engineer can go to customer factory to installation . buyer should prepare materials used to testing the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary 100USD/Day per person since the day start out until the day arriving at factory.

7:What are your terms of payment?
We accept T/T, L/C. western union.

8. How could we do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

9: Does your engineer understand English?

A: Our engineer understand a little English. All our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.



Product Tag:
Related categories:
Scroll to Top