Brsgl057 Efficiency LED Garden Use Solar Light

Min.Order: 20
Product origin: Yangzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 200 ~ 230

Description
l
Company Profile

Product Parameters

  Component Specification
Lighting space
working hours
lasting days
LED light
lighting pole
solar panel
lithium battery
30W
6M
120W
60AH
>20M
10~12 hours
3~4 days
40W
7M
150W
75AH
>20 M
10~12 hours
3~4 days
50W
8M
180W
95AH
>20 M
10~12 hours
3~4 days
60W
8M
200W
120AH
>25 M
10~12 hours
3~4 days
80W
8M
240W
150AH
>25 M
10~12 hours
3~4 days
100W
10M
300W
100AH*2PCS
>40 M
10~12 hours
3~4 days
ed garden use solar light
Key Specifications/Special Features:
Solar module: 20 to 60Wp polycrystalline
Light pole: 3.5 to 5m common steel
Hot galvanized and plastic-sprayed
Controller: 12V, 5A light control, time control, temperature compensation, over-charge, over-discharge, revert and short circuit protect
Light source: 3 to 10W high luminance LED
Irradiance efficiency: 65 to 90lm
Storage battery: 26 to 45Ah maintenance-free Lead-acid storage battery
Working voltage: 12V
Working temperature: 35 to 65° C
Wind resistance: IP65
Working time: 8 to 12 hours/day

Rainy and cloudy days in session: 5 to 7 days
Payment Details:
Payment Terms:
Telegraphic Transfer (TT, T/T)
Minimum Order:
1 to 99 Pieces
Delivery Details:
FOB Port:
Shanghai
Lead Time:
10 - 20 days 
Certifications

Field of application

Machinery and equipment

Our Advantages


 

Packaging & Shipping



FAQ 

1.Question : Are you a factory or trading company ? 
Answer: We are an SGS recognized OEM / ODM manufacturer factory with export license. We have an outstanding and experienced team made up of "A" player who have a passion for doing something great to create more value for customers world-wide.
 

2. Question :  Why choose cooperate with us ? 
Answer :     -- Right people, Right product, Right price ;
                   -- Company-wide customer awareness ;
                   -- Reliable Quality and All components from world leading suppliers ;
                   -- Cost-effective export infrastructure and total supply chain management ;
 

3. Question : How does your factory do regarding quality control ? 
Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
 

4. Question : What is the average delivery time ? 
Answer : Most of the time, it would be around 1 week since after confirm receiving customers' contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case. 

Scroll to Top