Precise Hardware Stamping Tools Deep Drawing Mould Progressive Stamping Die

Min.Order: 1
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 80

Description
Products Description
Brand Name
SWOER
Product Name
Metal Stamping Die/Mould
Tolerance
±0.002mm
Material
SKD11, SKD 61, Cr12MOV, D2, SKH-9, RM56, ASP23 etc.
Design Software
AutoCAD, Solid works, PRO/E, UG
Standard
ISO9001
Mould Type
Compound Stamping Die, Single Stamping Die, Progressive die or according to Customer's requirements
First Trial
15-25 days after mold drawing confirmed
Mould Life
Depends on customer's production capacity
Quality confirm
Can send strip layout of die, testing video, inspection certificate and sample of product
Package
PE bags and carton for products, wooden case for Die/mold, or as customer's requirements


3D Drawing of Stamping Die Hardwares


About Us

SWOER mould center have an more than 12 experienced and skilled technical mould engineer.The center subordinates CNC matching area,WEDM-LS area,WEDM-MS area,Milling machine area,Grinding area and mould assembling area.We provide one-stop mould solution through ERP mould integrated management and CAD/CAM/CAE technical design.Our mould R&D and productions ability rank top in domestic industry.

Our Technology

FAQ

Q1: Do you trust SWOER?

       We are a factory which has been producing metal stamping parts for more than 12 years. 

 

Q2: What is the technical level of your company's engineers?

A: Our company's engineers have more than ten years of experience in the hardware industry. Our engineers will help customers solve technical problems.

 

Q3: Can I get the samples?

A: Yes,sample order is available for quality check and market test, and it will be freightcollect payment. What's more, Our company has Germany CNC MINI BENDING machine. It can produce samples in one day. Greatly improve efficiency.

 

Q4: What's your payment term?

A: 40% T/T in advance , 60% balance before shippment.

 

Q5:How long is your delivery time?
 A:Generally it is about 10 days if the goods are in stock. or it is 15-20 days if the goods are customized, it is according to quantity.

 

Product Tag:
Related categories:
Scroll to Top