Metal Stamping China Manufacturer-China Stamping Parts

Min.Order: 100
Product origin: Shenzhen, Guangdong, China
Infringement complaint: complaintComplaint
US$ 0.3

Description
Product Description
 
Material: 
Stainless Steel SS201,SS301, SS303, SS304, SS316, SS416 etc. 
SteelMild steel, Carbon steel, CRS ,SPCC ,4140, 4340, Q235, Q345B, 20#, 45# etc.
BrassHPb63, HPb62, HPb61, HPb59, H59, H68, H80, H90 etc.
CopperC11000,C12000,C12000 C36000 etc.
AluminumAL6061, Al6063, AL6082, AL7075, AL5052, A380 etc.
BrassH90,H80,H68,H62.
 
Finish:       
Aluminum:Clear AnodizedColor AnodizedSandblast AnodizedChemical FilmBrushingPolishingChrome
Stainless Steel:PolishingPassivationSandblastingLaser Engraving   
Steel:Zinc PlatingOxide BlackNickel PlatingPowder CoatedCarburizeHeat TreatmentChrome

 About Us:
Equipment:20-200 Ton Stamping machines,Bending machines,Punching machine
Size:According to customer's design or sample.
Thickness0.02mm - 8mm
Tolerance0.01mm
DesignCAD, Pro/E, UG (dwg,  IGS, STP,  ), PDF  or Sample.
Mould:1. We make tooling by ourselves according to customer's drawing or sample.2. We send samples to customer to confirm first3. Lifetime free maintain
Confirm SampleIf the first sample is not satisfied customer, we will modify the mould until customer satisfied.
Packing:According to customer's requirement.
Documents available:ISO certificate, material SGS testing reports, products certificate, company SGS report, COC report
Certificate:ISO9001: 2008 approval, SGS compliance

Company show 











FAQ
1.Q: How To Order?
A: Step 1, please tell us confirm the drawing and quantity that you want it ;
   Step 2, then we will make a PI for you to confirm the order details;
   Step 3, when we confirmed everything, can arrange the payment;
   Step 4, finally we deliver the goods within the stipulated time.


2. After-sales Service
1 year warranty for all kinds of products; If you find any defective accessories first time, we will give you the new parts for free to replace in the next order, as an experienced manufacturer, you can rest assured of the quality and after-sales service.

3.What is the mode of payment?

T/T, Western Union, Moneygram ,L/C,Other ways can also accept.

4.What about the lead time for mass production?
    It's about 20-30 days after the deposit.
 

Please directly send us drawing or contact us if you have any questions. Thank you in advance. 

Att :Eva Shaw
 
 
Product Tag:
Related categories:
Scroll to Top