TDA10Z e bike,electric bicycle | |||
Electric system | Main components | ||
Motor | light weight high speed brushless. | Frame | 6061 al alloy. |
Tyres | 700C*1.75/2.0 KENDA brand. | ||
Rim | Al alloy double wall and CNC side wall. | ||
Front fork | Al alloy suspension. | ||
Front brake | Disk brake.("V" brake available). | ||
Rear brake | "V" brake. | ||
Battery | All battery with electric protection circuit. | Speed gears | SHIMANO 6/7 speed gears. |
PAS | 1:1 intelligent pedal assistant system. | Derailleur | SHIMANO TOURNEY |
Controller | 36V intelligent brushless | Handle bar | ZOOM Al alloy. |
Charger | AC 100V-240V, 2 Amps smart charger. | Stem | ZOOM Al alloy. |
Charge time:4-6 hours. | Brake lever | Al alloy, cut-off when braking. | |
Throttle | Twist intelligent speed control. | Chain | Rust resistant chain. |
Performance | Chain wheel | Steel 40 T, al alloy crank. | |
Mudguard | PP plastic. | ||
Range | 40km with full electric (36V/10Ah battery). | Rear rack | Al alloy. |
60km-70km with PAS. | Saddle | Soft comfortable | |
Max load | 100kg. | Seat post | Steel folding or aluminium suspension |
Pedal | City style pedal with reflector. | ||
Capacity | 98pcs/20ft container, 206pcs/40 HQ. | ||
Carton Size | 1510*270*910cm |
A Passion for E-bikes Manufacturing :
MerryGo strives for excellence in every endeavor. We work to assess, improve, and build upon the success of our operations and product lines. We look forward to growing our business in tandem with our clients and bringing incomparable solutions for a host of international brands.
Our Service :
Q1. What is your terms of packing?
A: Generally, the goods is packed with foam protection and foam block inside, cartons outside. If you have any legally registered patent, we can pack the goods in your branded boxed after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the prodcts and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30-60 days after the receipt of deposit payment. If there are materials stocked for this style, then it takes around 15-30 days.
Q5. Can you produce according to the samples?
A: Yes, the production can be arranged depending on your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: The samples can be supplied if there are ready parts in stock, and the client will cover the sample and courier cost.
Q7. Do you test all of your goods before delivery?
A: Yes, the goods are all 100% test and inspected before delivery.
Q8. How do you make our business long-term and good relationships?
A: 1. We keep quality and competitive price to ensure our clients' benefit;
2. We respect every customer as our friend and we sincerely do business no matter where they come from.