H U /Z/L Shape Structure Steel Sheet Construction Beam

Min.Order: 25
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 580 ~ 1000

Product Description

Our company special in Steel Product, Steel Plate, carbon steel plate, hot rolled steel plate, cold rolled steel plate, stainless steel plates, steel circle, color coated steel plate, hot plate, steel coils, etc.


Specifications
Packaging & Delivery
Packaging Details:standard export packing or as ordered
Delivery Detail:depends on the order, usually within 30 days
Specifications
1. Widely used in embankment, dock, retaining walls etc. 
2 meet different needs with different type 
3 high quality and service
Standard: GB/T20933, JIS, EN, etc.
Length: 6m 12m or others

SProduct Description
 1.standard:GB/T20933,JIS,ASTM,ECT
2.length:12m
3.payment term:30%prepayment,70%before sending to port
4.payment way:L/c at sight,TT,ect
commodityu type hot rolled steel sheet pile
sizecustomized
materialQ195,Q235,Q235B,Q345
standardAISI,ASTM,BS,GB
techniquehot rolled
MOQ25MT,open to discussion
port of loadingAny port of China
deliverywithin 7-15 days upon the receipt of payment
paymentL/C,T/T
packagingstandard exporting packing or as per request

 U type steel sheet piles size
W*H(mm)thickness(mm)weight(kg/m)
400*10010.548.0
400*12513.060.0
400*17015.576.1
500*21011.577.5
500*21015.687.5
500*21020.0103.0
500*22527.6120.1
600*13010.361.8
600*18013.481.6
600*21018.0106.2
 
Linear type steel sheet piles size
W*H(mm)thickness(mm)weight(kg/m)
500*9.59.561.7
500*1111.068
500*1212.071.1
500*12.712.773.4

grade and chemical composition
gradeCSIMNPSVNbTiCEV
Q295P0.160.501.50.0350.0350.150.060.200.40
Q345P0.200.501.70.0350.0350.150.060.200.42
Q390P0.200.501.70.0350.0350.200.060.200.44
Q420P0.200.501.70.0350.0350.200.060.200.46
Q490P0.200.601.80.0300.0300.200.110.200.46

Advantage of using steel sheet pile 
Widely used in embankment, dock, retaining walls etc.
1. Used for the permanent constructional structure. Such as embankment, harbors, docks, retaining walls, anti-earthquake reinforcement project, and flood gates.
2. Used for the provisional structure to seal the mountain, provisionally to retain the wall, to cut off the river, to cofferdam, to lay the pipeline and to ward off the earth, the water or the sand.
 
3. Used for the flood-fighting and emergency rescues to prevent the flood, collapse, sink or sediment flow

 
website: https://wghongxing88.en.made-in-china.com/


Product Tag:
Related categories:
Scroll to Top